Bill Text: TX SB2627 | 2023-2024 | 88th Legislature | Comm Sub
NOTE: There are more recent revisions of this legislation. Read Latest Draft
Bill Title: Relating to funding mechanisms to support the construction, maintenance, modernization, and operation of electric generating facilities.
Spectrum: Slight Partisan Bill (Republican 3-1)
Status: (Passed) 2023-06-09 - Effective on adoption of const. amendment [SB2627 Detail]
Download: Texas-2023-SB2627-Comm_Sub.html
Bill Title: Relating to funding mechanisms to support the construction, maintenance, modernization, and operation of electric generating facilities.
Spectrum: Slight Partisan Bill (Republican 3-1)
Status: (Passed) 2023-06-09 - Effective on adoption of const. amendment [SB2627 Detail]
Download: Texas-2023-SB2627-Comm_Sub.html
88R31198 JXC-D | ||
By: Schwertner, et al. | S.B. No. 2627 | |
(Hunter) | ||
Substitute the following for S.B. No. 2627: No. |
|
||
|
||
relating to funding mechanisms to support the construction and | ||
operation of electric facilities. | ||
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | ||
SECTION 1. This Act may be cited as the Powering Texas | ||
Forward Act. | ||
SECTION 2. Subtitle B, Title 2, Utilities Code, is amended | ||
by adding Chapter 34 to read as follows: | ||
CHAPTER 34. FACILITY FUNDING | ||
Sec. 34.0101. DEFINITIONS. In this chapter: | ||
(1) "Advisory committee" means the Texas Energy Fund | ||
Advisory Committee. | ||
(2) "Fund" means the Texas energy fund established by | ||
Section 49-q, Article III, Texas Constitution. | ||
(3) "Trust company" means the Texas Treasury | ||
Safekeeping Trust Company. | ||
Sec. 34.0102. FUND. (a) The fund is a special fund in the | ||
state treasury outside the general revenue fund to be administered | ||
and used by the commission for the purposes authorized by this | ||
chapter. The commission may establish separate accounts in the | ||
fund. | ||
(b) The fund and the fund's accounts are kept and held by the | ||
trust company for and in the name of the commission. | ||
(c) Money deposited to the credit of the fund may be used | ||
only as provided by this chapter. | ||
(d) The fund consists of: | ||
(1) money appropriated, credited, transferred, or | ||
deposited to the credit of the fund by or as authorized by law, | ||
including money from any source transferred or deposited to the | ||
credit of the fund at the commission's discretion; | ||
(2) revenue that the legislature by statute dedicates | ||
for deposit to the credit of the fund; | ||
(3) investment earnings and interest earned on money | ||
in the fund; and | ||
(4) gifts, grants, and donations contributed to the | ||
fund. | ||
Sec. 34.0103. LOANS FOR ERCOT POWER REGION. (a) The | ||
commission may use money in the fund without further appropriation | ||
to provide loans to finance upgrades to existing dispatchable | ||
electric generating facilities providing power for the ERCOT power | ||
region that result in a net increase of 100 megawatts of capacity | ||
for each facility or the construction of dispatchable electric | ||
generating facilities providing power for the ERCOT power region | ||
that each have a generation capacity of at least 100 megawatts. For | ||
the purposes of this section, a generating facility is considered | ||
to be dispatchable if the facility's output can be controlled | ||
primarily by forces under human control. An electric energy | ||
storage facility is not eligible for a loan under this section. | ||
(b) The commission may provide a construction loan under | ||
this section only: | ||
(1) for construction of a facility that will have a | ||
generation capacity of at least 100 megawatts and that does not meet | ||
the planning model requirements necessary to be included in the | ||
Capacity Demand and Reserves Report of the independent organization | ||
certified under Section 39.151 for the ERCOT power region before | ||
June 1, 2023; | ||
(2) in an amount that does not exceed 60 percent of the | ||
estimated cost of the facility to be constructed; and | ||
(3) if the agreement ensures that the loan is to be the | ||
senior debt secured by the facility. | ||
(c) The commission shall evaluate an application for a loan | ||
under this section based on: | ||
(1) the applicant's: | ||
(A) quality of services and management; | ||
(B) efficiency of operations; | ||
(C) history of electricity generation operations | ||
in this state and this country; | ||
(D) resource operation attributes; | ||
(E) ability to address regional and reliability | ||
needs; | ||
(F) access to resources essential for operating | ||
the facility for which the loan is requested, such as land, water, | ||
and reliable infrastructure, as applicable; and | ||
(G) evidence of creditworthiness and ability to | ||
repay the loan on the terms established in the loan agreement, | ||
including the applicant's total assets, total liabilities, net | ||
worth, and credit ratings issued by major credit rating agencies; | ||
(2) the generation capacity and estimated costs of the | ||
project for which the loan is requested; and | ||
(3) any other factors the commission considers | ||
appropriate. | ||
(d) Outstanding loans provided under this section and | ||
grants provided under Section 34.0104, considered together, may not | ||
support the addition or construction of more than the amount of | ||
megawatts of generation capacity needed to meet reliability | ||
standards, goals, or operational targets for the ERCOT power | ||
region, as determined by the commission. | ||
(e) An electric utility other than a river authority may not | ||
receive a loan under this section. | ||
(f) A loan provided under this section must: | ||
(1) have a term of 20 years; | ||
(2) be payable ratably starting on the seventh | ||
anniversary of the date the loan is issued; and | ||
(3) bear an interest rate of two percent. | ||
(g) The commission shall require each recipient of a loan | ||
under this section to deposit in an escrow account held by the | ||
comptroller an amount of money equal to three percent of the | ||
estimated cost of the project for which the loan is provided. The | ||
deposit must be made before the loan funds are disbursed. The loan | ||
recipient may not withdraw the deposit unless authorized by the | ||
commission. | ||
(h) For money deposited under Subsection (g) for a loan for | ||
the construction of a new facility, the commission: | ||
(1) shall authorize the loan recipient to withdraw the | ||
deposit from the escrow account if the facility for which the loan | ||
was provided is interconnected in the ERCOT power region before the | ||
fourth anniversary of the date the loan funds were disbursed; or | ||
(2) after the fourth anniversary of the date the loan | ||
funds were disbursed, may authorize the loan recipient to withdraw | ||
the deposit from the escrow account if the facility for which the | ||
loan was provided is interconnected in the ERCOT power region not | ||
later than the fifth anniversary of the date the loan funds were | ||
disbursed and the commission determines that extenuating | ||
circumstances justify the delay in completion. | ||
(i) For money deposited under Subsection (g) for a loan for | ||
an upgrade to an existing facility, the commission: | ||
(1) shall authorize the loan recipient to withdraw the | ||
deposit from the escrow account if the project for which the loan | ||
was provided is completed before the third anniversary of the date | ||
the loan funds were disbursed; or | ||
(2) after the third anniversary of the date the loan | ||
funds were disbursed, may authorize the loan recipient to withdraw | ||
the deposit from the escrow account if the project for which the | ||
loan was provided is completed not later than the fourth | ||
anniversary of the date the loan funds were disbursed and the | ||
commission determines that extenuating circumstances justify the | ||
delay in completion. | ||
(j) The comptroller shall deposit to the credit of the fund | ||
any escrow funds described by Subsection (g) that the commission | ||
may not authorize to be withdrawn by a loan recipient. | ||
(k) Information submitted to the commission in an | ||
application for a loan under this section is confidential and not | ||
subject to disclosure under Chapter 552, Government Code. | ||
(l) The commission may not disburse money for a loan under | ||
this section after December 31, 2026. | ||
Sec. 34.0104. COMPLETION BONUS GRANTS. (a) The commission | ||
shall provide, using money available in the fund for the purpose | ||
without further appropriation, a completion bonus grant for the | ||
construction of dispatchable electric generating facilities in the | ||
ERCOT power region. For the purposes of this section, a generating | ||
facility is considered to be dispatchable if the facility's output | ||
can be controlled primarily by forces under human control. An | ||
electric energy storage facility is not eligible for a grant under | ||
this section. | ||
(b) The amount of a grant under this section must be based on | ||
the megawatts of capacity provided to the ERCOT power region by the | ||
facility. | ||
(c) The commission may provide a grant under this section | ||
only for construction of a facility that: | ||
(1) will have a generation capacity of at least 100 | ||
megawatts; | ||
(2) does not meet the planning model requirements | ||
necessary to be included in the Capacity Demand and Reserves Report | ||
of the independent organization certified under Section 39.151 for | ||
the ERCOT power region before June 1, 2023; and | ||
(3) is interconnected in the ERCOT power region not | ||
later than December 31, 2028, or, if the commission determines that | ||
extenuating circumstances justify a delay in the facility's | ||
completion, before a later date as specified by the commission that | ||
must be not later than June 1, 2029. | ||
(d) The commission shall evaluate an application for a grant | ||
under this section based on: | ||
(1) the applicant's: | ||
(A) quality of services and management; | ||
(B) efficiency of operations; | ||
(C) history of electricity generation operations | ||
in this state and this country; | ||
(D) resource operation attributes; and | ||
(E) ability to address regional and reliability | ||
needs; | ||
(2) the generation capacity and estimated | ||
construction costs of the facility for which the grant is | ||
requested; and | ||
(3) any other factors the commission considers | ||
appropriate. | ||
(e) Information submitted to the commission in an | ||
application for a grant under this section is confidential and not | ||
subject to disclosure under Chapter 552, Government Code. | ||
(f) The commission may not provide a grant under this | ||
section of more than $100,000 per megawatt of capacity provided by | ||
the facility. | ||
(g) The commission may not provide a grant under this | ||
section after September 1, 2029. | ||
Sec. 34.0105. LOAN AND GRANT RESTRICTIONS. (a) If the | ||
commission has more than four pending applications for loans to be | ||
made from the fund on the date the commission awards a loan, the | ||
amount of the loan awarded may not exceed 25 percent of the fund | ||
balance on that date. | ||
(b) The commission may not provide a loan or a grant for a | ||
facility under this chapter if the facility will be used primarily | ||
to serve an industrial load or private use network. | ||
(c) Before December 31, 2026, the commission may provide: | ||
(1) for loans under Section 34.0103, not more than 80 | ||
percent of the money available in the fund on December 1, 2023; and | ||
(2) for grants under Section 34.0104, not more than 20 | ||
percent of the money available in the fund on December 1, 2023. | ||
(d) Subsection (c) and this subsection expire December 31, | ||
2026. | ||
Sec. 34.0106. MANAGEMENT AND INVESTMENT OF FUND. (a) The | ||
trust company shall hold and invest the fund, and any accounts | ||
established in the fund, for and in the name of the commission, | ||
taking into account the purposes for which money in the fund may be | ||
used. The fund may be invested with the state treasury pool and | ||
commingled with other investments. | ||
(b) The overall objective for the investment of the fund is | ||
to maintain sufficient liquidity to meet the needs of the fund while | ||
striving to preserve the purchasing power of the fund over a full | ||
economic cycle. | ||
(c) In managing the assets of the fund, the trust company | ||
may acquire, exchange, sell, supervise, manage, or retain any kind | ||
of investment that a prudent investor, exercising reasonable care, | ||
skill, and caution, would acquire or retain in light of the | ||
purposes, terms, distribution requirements, and other | ||
circumstances of the fund then prevailing, taking into | ||
consideration the investment of all the assets of the fund rather | ||
than a single investment. | ||
(d) The reasonable expenses of managing the fund's assets | ||
shall be paid from the fund. | ||
(e) The trust company annually shall provide a written | ||
report to the commission and to the advisory committee with respect | ||
to the investment of the fund. | ||
(f) The trust company shall adopt a written investment | ||
policy that is appropriate for the fund. The trust company shall | ||
present the investment policy to the investment advisory board | ||
established under Section 404.028, Government Code. The investment | ||
advisory board shall submit to the trust company recommendations | ||
regarding the policy. | ||
(g) The commission annually shall provide to the trust | ||
company a forecast of the cash flows into and out of the fund. The | ||
commission shall provide updates to the forecasts as appropriate to | ||
ensure that the trust company is able to achieve the objective | ||
specified by Subsection (b). | ||
(h) The trust company shall disburse money from the fund as | ||
directed by the commission. | ||
Sec. 34.0107. RECEIVERSHIP OF DEFAULT GENERATING FACILITY. | ||
(a) In this section, "default" means: | ||
(1) default in payment of the principal of or interest | ||
on a loan; or | ||
(2) a failure to perform any of the terms of a loan. | ||
(b) The state, including the commission, the advisory | ||
committee, and the trust company, may not retain an ownership | ||
interest in a project or facility for which a loan is provided under | ||
this chapter. | ||
(c) In the event of a default on a loan made under this | ||
chapter, at the request of the commission, the attorney general | ||
shall bring suit in a district court in Travis County for the | ||
appointment of a receiver to collect the assets and carry on the | ||
business of a loan recipient if the action is necessary to cure a | ||
default by the recipient. | ||
(d) The court shall vest a receiver appointed by the court | ||
with any power or duty the court finds necessary to cure the | ||
default, including the power or duty to: | ||
(1) perform audits; | ||
(2) direct ongoing operation of the assets; | ||
(3) fund reserve accounts; | ||
(4) make payments of the principal of or interest on | ||
bonds, securities, or other obligations; and | ||
(5) take any other action necessary to prevent or to | ||
remedy the default, including the sale of assets. | ||
(e) The receiver shall execute a bond in an amount to be set | ||
by the court to ensure the proper performance of the receiver's | ||
duties. | ||
(f) After appointment and execution of bond, the receiver | ||
shall take possession of the books, records, accounts, and assets | ||
of the defaulting loan recipient specified by the court. Until | ||
discharged by the court, the receiver shall perform the duties that | ||
the court directs and shall strictly observe the final order | ||
involved. | ||
(g) On a showing of good cause by the defaulting loan | ||
recipient, the court may dissolve the receivership. | ||
Sec. 34.0108. TEXAS ENERGY FUND ADVISORY COMMITTEE. (a) | ||
The advisory committee is composed of the following six members: | ||
(1) three members of the senate appointed by the | ||
lieutenant governor, including: | ||
(A) a member of the committee of the senate | ||
having primary jurisdiction over matters relating to the generation | ||
of electricity; and | ||
(B) a member of the committee of the senate | ||
having primary jurisdiction over finance; and | ||
(2) three members of the house of representatives | ||
appointed by the speaker of the house of representatives, | ||
including: | ||
(A) a member of the committee of the house of | ||
representatives having primary jurisdiction over the generation of | ||
electricity; and | ||
(B) a member of the committee of the house of | ||
representatives having primary jurisdiction over finance. | ||
(b) A member of the advisory committee serves at the will of | ||
the person who appointed the member. | ||
(c) The lieutenant governor shall appoint a co-presiding | ||
officer of the advisory committee from among the members appointed | ||
by the lieutenant governor. The speaker of the house of | ||
representatives shall appoint a co-presiding officer of the | ||
advisory committee from among the members appointed by the speaker. | ||
(d) The advisory committee may hold public hearings, formal | ||
meetings, and work sessions. Either co-presiding officer of the | ||
advisory committee may call a public hearing, formal meeting, or | ||
work session of the advisory committee at any time. The advisory | ||
committee may not take formal action at a public hearing, formal | ||
meeting, or work session unless a quorum of the committee is | ||
present. | ||
(e) Except as otherwise provided by this subsection, a | ||
member of the advisory committee is not entitled to receive | ||
compensation for service on the committee or reimbursement for | ||
expenses incurred in the performance of official duties as a member | ||
of the committee. Service on the advisory committee by a member of | ||
the senate or house of representatives is considered legislative | ||
service for which the member is entitled to reimbursement and other | ||
benefits in the same manner and to the same extent as for other | ||
legislative service. | ||
(f) The advisory committee: | ||
(1) may provide comments and recommendations to the | ||
commission for the commission to use in adopting rules regarding | ||
the use of the fund or on any other matter; and | ||
(2) shall review the overall operation, function, and | ||
structure of the fund at least semiannually. | ||
(g) The advisory committee may adopt rules, procedures, and | ||
policies as needed to administer this section and implement its | ||
responsibilities. | ||
(h) Chapter 2110, Government Code, does not apply to the | ||
size, composition, or duration of the advisory committee. | ||
(i) The advisory committee is subject to Chapter 325, | ||
Government Code (Texas Sunset Act). Unless continued in existence | ||
as provided by that chapter, the advisory committee is abolished | ||
September 1, 2035. | ||
Sec. 34.0109. RULES. (a) The commission by rule may | ||
establish procedures for: | ||
(1) the application for and award of a grant or loan | ||
under this chapter; and | ||
(2) the administration of the fund. | ||
(b) The commission shall give full consideration to | ||
comments and recommendations of the advisory committee. | ||
SECTION 3. Section 35.005, Utilities Code, is amended by | ||
adding Subsections (d), (e), and (f) to read as follows: | ||
(d) The independent organization certified under Section | ||
39.151 for the ERCOT power region shall work with electric | ||
utilities to ensure that each facility in the ERCOT power region for | ||
which a loan or grant is provided under Chapter 34 is fully | ||
interconnected in the region not later than the date the facility is | ||
ready for commercial operation. The independent organization | ||
certified under Section 39.151 for the ERCOT power region shall | ||
give priority to interconnecting each facility for which a loan or | ||
grant is provided under Chapter 34 except that the organization | ||
shall prioritize transmission projects that the organization has | ||
formally designated as critical for reliability over a facility for | ||
which a loan or grant is provided under Chapter 34. An electric | ||
utility that enters into an interconnection agreement for a | ||
facility for which a loan or grant is provided under Chapter 34 | ||
shall give priority to interconnecting the facility and complete | ||
construction of any other facilities necessary to interconnect the | ||
facility not later than the date the facility is ready for | ||
commercial operation except that the utility shall prioritize | ||
transmission projects that the independent organization certified | ||
under Section 39.151 for the ERCOT power region has formally | ||
designated as critical for reliability over a facility for which a | ||
loan or grant is provided under Chapter 34. | ||
(e) If the commission receives an application under Chapter | ||
37 for a certificate of convenience and necessity related to | ||
facilities necessary to interconnect a facility for which a loan or | ||
grant is provided under Chapter 34 and does not approve the | ||
application before the 90th day after the date the commission | ||
received the application, the deadline established by Subsection | ||
(d) is extended one day for each day after the 90th day in which the | ||
commission does not approve the application. | ||
(f) The commission may extend the deadline established by | ||
Subsection (d) after notice, hearing, and a determination on a | ||
showing of good cause that fully interconnecting the facility | ||
before the deadline is not feasible. | ||
SECTION 4. Not later than December 31, 2026, the Public | ||
Utility Commission of Texas shall accept loan applications for | ||
loans authorized by Chapter 34, Utilities Code, as added by this | ||
Act, approve or deny each loan application, and disburse loan funds | ||
for each approved applicant. | ||
SECTION 5. This Act takes effect on the date on which the | ||
constitutional amendment proposed by the 88th Legislature, Regular | ||
Session, 2023, providing for the creation of the Texas energy fund | ||
to support the construction and operation of electric facilities | ||
takes effect. If that amendment is not approved by the voters, this | ||
Act has no effect. |