Bill Text: TX SB330 | 2023-2024 | 88th Legislature | Introduced
NOTE: There are more recent revisions of this legislation. Read Latest Draft
Bill Title: Relating to the resilience of the electric grid and certain municipalities.
Spectrum: Bipartisan Bill
Status: (Engrossed - Dead) 2023-05-23 - Placed on General State Calendar [SB330 Detail]
Download: Texas-2023-SB330-Introduced.html
Bill Title: Relating to the resilience of the electric grid and certain municipalities.
Spectrum: Bipartisan Bill
Status: (Engrossed - Dead) 2023-05-23 - Placed on General State Calendar [SB330 Detail]
Download: Texas-2023-SB330-Introduced.html
88R3548 CXP-F | ||
By: Hall, et al. | S.B. No. 330 |
|
||
|
||
relating to the resilience of the electric grid and certain | ||
municipalities; authorizing an administrative penalty. | ||
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | ||
SECTION 1. The legislature finds that: | ||
(1) electric grid blackouts threaten the lives of the | ||
citizens of this state and pose a disproportionately large risk to: | ||
(A) the elderly, vulnerable, and underprivileged | ||
within this state; and | ||
(B) communities facing disproportionate | ||
environmental health burdens and population vulnerabilities | ||
relating to facilities such as chemical plants and refineries that | ||
can become environmental disaster areas when taken off-line due to | ||
loss of electricity; | ||
(2) the 16 critical infrastructures identified in | ||
President Barack Obama's Presidential Policy Directive "Critical | ||
Infrastructure Security and Resilience" (PPD-21) including water | ||
and wastewater systems, food and agriculture, communications | ||
systems, the energy sector including refineries and fuel | ||
distribution systems, chemical plants, the financial sector, | ||
hospitals and health care facilities, law enforcement and | ||
government facilities, nuclear reactors, and other critical | ||
functions depend on the electric grid in this state and make the | ||
grid's protection vital to the economy of this nation and homeland | ||
security; | ||
(3) the blackout that occurred in this state in | ||
February 2021 caused: | ||
(A) death and suffering in this state; | ||
(B) economic loss to this state's economy; | ||
(C) impacts to all critical infrastructures in | ||
this state; | ||
(D) the dispatch of generation units that likely | ||
exceeded limits established by the Environmental Protection Agency | ||
for sulfur dioxide, nitrogen oxide, mercury, and carbon monoxide | ||
emissions and wastewater release limits; | ||
(E) radically increased pricing of electricity | ||
that resulted in making electric power bills unaffordable to many | ||
customers across this state; and | ||
(F) the exacerbation of the COVID-19 pandemic | ||
risk by forcing many of the state's citizens to consolidate at | ||
warming centers and in other small spaces where warmth for survival | ||
superseded social distancing protocols; | ||
(4) a previous large-scale blackout occurred in this | ||
state in February 2011 during which 4.4 million customers were | ||
affected; | ||
(5) this state is uniquely positioned to prevent | ||
blackouts because this state is a net exporter of energy and is the | ||
only state with an electric grid almost exclusively within its | ||
territorial boundaries; | ||
(6) the 2011 and 2021 blackouts call into question: | ||
(A) whether too much risk has been accepted | ||
regarding weatherization of electric generation infrastructure; | ||
(B) whether this state lacks the internal | ||
distribution structure and control systems to manage rolling | ||
blackouts; and | ||
(C) whether sufficient resources have been | ||
allocated toward overall grid resilience; | ||
(7) public confidence in the resilience of the | ||
electric grid in this state is essential to ensuring economic | ||
prosperity, domestic tranquility, continuity of government, and | ||
life-sustaining systems; | ||
(8) a resilient electric grid that offers businesses | ||
in this state continuity of operations in the event of a natural or | ||
man-made disaster will be an unrivaled attraction for businesses to | ||
expand or move their operations to this state and for protecting | ||
what is important to this state, including its military | ||
installations and its environment; | ||
(9) current market incentives and regulations are not | ||
sufficient for electric utilities to: | ||
(A) prioritize grid security and resilience; and | ||
(B) protect the grid against hazards; | ||
(10) protection of the electric grid in this state | ||
against hazards would assure businesses and the citizens of this | ||
state that the "lights will be back on first in Texas" in the event | ||
of a nationwide catastrophe affecting electric infrastructure, | ||
sparing catastrophic societal and environmental consequences for | ||
this state; and | ||
(11) when this state begins implementation of the plan | ||
for all hazards resilience described by Section 44.007, Utilities | ||
Code, as added by this Act, to protect the electric grid in this | ||
state, short-term and long-term economic benefit will far exceed | ||
even the most optimistic estimates of the conventional economic | ||
incentives provided by tax abatements to attract businesses to this | ||
state. | ||
SECTION 2. Subtitle B, Title 2, Utilities Code, is amended | ||
by adding Chapter 44 to read as follows: | ||
CHAPTER 44. GRID RESILIENCE | ||
Sec. 44.001. DEFINITIONS. In this chapter: | ||
(1) "All hazards" means: | ||
(A) terrestrial weather including wind, | ||
hurricanes, tornadoes, flooding, ice storms, extended cold weather | ||
events, heat waves, and wildfires; | ||
(B) seismic events including earthquakes and | ||
tsunamis; | ||
(C) physical threats including terrorist attacks | ||
with direct fire, drones, explosives, and other methods of physical | ||
sabotage; | ||
(D) cyber attacks including malware attacks and | ||
hacking of unprotected or compromised information technology | ||
networks; | ||
(E) manipulation of operational technology | ||
devices including sensors, actuators, and drives; | ||
(F) electromagnetic threats through man-made | ||
radio frequency weapons, high altitude nuclear electromagnetic | ||
pulse, and naturally occurring geomagnetic disturbances; | ||
(G) electric generation supply chain | ||
vulnerabilities including insecure or inadequate fuel | ||
transportation or storage; and | ||
(H) insider threats caused by compromised or | ||
hostile personnel working within government or the utility | ||
industry. | ||
(2) "Micro-grid" means a group of interconnected loads | ||
and distributed energy resources inside clearly defined electrical | ||
boundaries that act as a single controllable entity with respect to | ||
the grid. | ||
(3) "Security commission" means the Texas Grid | ||
Security Commission. | ||
Sec. 44.002. TEXAS GRID SECURITY COMMISSION. (a) The Texas | ||
Grid Security Commission is composed of the following members: | ||
(1) a representative of the Texas Division of | ||
Emergency Management appointed by the chief of that division; | ||
(2) a representative of the State Office of Risk | ||
Management appointed by the risk management board; | ||
(3) a representative from the commission appointed by | ||
that commission; | ||
(4) a representative from the Railroad Commission of | ||
Texas appointed by that commission; | ||
(5) a representative of the independent organization | ||
certified under Section 39.151 for the ERCOT power region appointed | ||
by the chief executive officer of that organization; | ||
(6) a representative of the Texas Military Department | ||
appointed by the adjutant general of that department; | ||
(7) a representative of the Texas Military | ||
Preparedness Commission appointed by that commission; | ||
(8) a representative of the Office of State-Federal | ||
Relations appointed by the director of that office; | ||
(9) a representative of the Department of Information | ||
Resources appointed by the executive director of that department; | ||
(10) a representative of power generation companies | ||
appointed by the chief of the Texas Division of Emergency | ||
Management; | ||
(11) two representatives of transmission and | ||
distribution utilities appointed by the chief of the Texas Division | ||
of Emergency Management; | ||
(12) three individuals with expertise in critical | ||
infrastructure protection appointed by the chief of the Texas | ||
Division of Emergency Management, to represent the public interest; | ||
(13) one representative appointed by the chief of the | ||
Texas Division of Emergency Management from each of the following | ||
essential services sectors: | ||
(A) law enforcement; | ||
(B) emergency services; | ||
(C) communications; | ||
(D) water and sewer services; | ||
(E) health care; | ||
(F) financial services; | ||
(G) food and agriculture; | ||
(H) transportation; and | ||
(I) energy; | ||
(14) an expert in the field of higher education | ||
appointed by the chief of the Texas Division of Emergency | ||
Management; and | ||
(15) an expert in the field of electricity markets and | ||
regulations appointed by the chief of the Texas Division of | ||
Emergency Management. | ||
(b) The chief of the Texas Division of Emergency Management | ||
may invite members or former members of the United States Air | ||
Force's Electromagnetic Defense Task Force to the membership of the | ||
security commission. | ||
(c) The Texas Division of Emergency Management shall | ||
designate a member of the security commission to serve as presiding | ||
officer. | ||
(d) The presiding officer may invite to the membership of | ||
the security commission any person whose expertise the security | ||
commission considers necessary to carry out the purposes of this | ||
chapter. | ||
(e) The security commission shall convene at the call of the | ||
presiding officer. | ||
(f) The security commission shall report to the chief of the | ||
Texas Division of Emergency Management. | ||
(g) A vacancy on the security commission is filled by | ||
appointment for the unexpired term in the same manner as the | ||
original appointment. | ||
(h) To the extent possible, individuals appointed to the | ||
security commission must be residents of this state. | ||
(i) The presiding officer of the security commission or the | ||
chief of the Texas Division of Emergency Management may invite | ||
subject matter experts to advise the security commission, including | ||
individuals recognized as experts in the fields of electricity | ||
markets, cybersecurity of grid control systems, electromagnetic | ||
pulse mitigation, terrestrial and solar weather, and micro-grids. | ||
The presiding officer may invite an individual for this purpose | ||
regardless of whether the individual is a resident of this state. | ||
Sec. 44.003. EXECUTIVE COMMITTEE. (a) The security | ||
commission executive committee is composed of the following | ||
security commission members selected by the presiding officer: | ||
(1) a representative of the Texas Division of | ||
Emergency Management; | ||
(2) a representative of the Railroad Commission of | ||
Texas; | ||
(3) a representative of the commission; | ||
(4) a representative of the independent organization | ||
certified under Section 39.151 for the ERCOT power region; | ||
(5) two representatives of transmission and | ||
distribution utilities; and | ||
(6) a representative of power generation companies or | ||
another member of the security commission with expertise in power | ||
generation. | ||
(b) If two or more members or former members of the United | ||
States Air Force's Electromagnetic Defense Task Force join the | ||
security commission after being invited under Section 44.002(b), | ||
the presiding officer shall select two of those members to serve on | ||
the executive committee. | ||
(c) The security commission may not adopt a resilience | ||
standard under Section 44.006 unless the executive committee | ||
approves the standard. | ||
Sec. 44.004. GRID RESILIENCE INFORMATION. (a) Each of the | ||
following members of the security commission shall apply for a | ||
secret security clearance or an interim secret security clearance | ||
to be granted by the federal government: | ||
(1) the representative of the independent | ||
organization certified under Section 39.151 for the ERCOT region; | ||
(2) the representative of the Texas Division of | ||
Emergency Management; and | ||
(3) the representative of the State Office of Risk | ||
Management. | ||
(b) A member of the security commission listed under | ||
Subsection (a) who is granted an applicable security clearance | ||
under that subsection is a member of the information security | ||
working group. | ||
(c) The information security working group shall determine: | ||
(1) which information received by the security | ||
commission that is used in determining the vulnerabilities of the | ||
electric grid or that is related to measures to be taken to protect | ||
the grid is confidential and not subject to Chapter 552, Government | ||
Code; | ||
(2) which members of the security commission may | ||
access which types of information received by the security | ||
commission; and | ||
(3) which members, other than members of the working | ||
group, should apply for a secret security clearance or interim | ||
clearance granted by the federal government. | ||
(d) Information that the information security working group | ||
determines is confidential under Subsection (c) shall be stored and | ||
maintained by the independent organization certified under Section | ||
39.151 for the ERCOT power region. | ||
(e) The security commission must maintain a reasonable | ||
balance between public transparency and security for information | ||
determined to be confidential under Subsection (c). | ||
(f) Nothing in this section abrogates any rights or remedies | ||
under Chapter 552, Government Code. | ||
Sec. 44.005. GRID RESILIENCE EVALUATION. (a) The security | ||
commission shall evaluate, using available information on past | ||
blackouts in ERCOT, all hazards to the ERCOT electric grid, | ||
including threats that can cause future blackouts. The security | ||
commission shall evaluate the resilience of municipalities in this | ||
state in the following essential areas: | ||
(1) emergency services; | ||
(2) communications systems; | ||
(3) clean water and sewer services; | ||
(4) health care systems; | ||
(5) financial services; | ||
(6) energy systems, including an evaluation of whether | ||
energy, electric power, and fuel supplies are protected and | ||
available for recovery in the event of a catastrophic power outage; | ||
and | ||
(7) transportation systems. | ||
(b) The security commission may create groups or teams to | ||
address each hazard as necessary. The security commission must | ||
assess each hazard both on the likelihood of occurrence of the | ||
hazard and the potential consequences of the hazard. | ||
(c) The security commission shall identify methods by which | ||
this state can support an overall national deterrence policy as | ||
proposed by the Cyberspace Solarium Commission, including by: | ||
(1) identifying means to ensure that all hazards | ||
resilience for electric utilities supports critical national | ||
security functions in this state; and | ||
(2) engaging the Texas National Guard to be trained as | ||
first responders to cybersecurity threats to the ERCOT electric | ||
grid and other critical infrastructure. | ||
(d) The security commission shall evaluate nuclear | ||
generation sites in this state, the resilience of each nuclear | ||
reactor to all hazards, and the resilience to all hazards of | ||
off-site power for critical safety systems that support the reactor | ||
and spent fuel. The security commission may communicate with the | ||
Nuclear Regulatory Commission to accomplish the evaluation. | ||
(e) The security commission shall evaluate current Critical | ||
Infrastructure Protection standards established by the North | ||
American Electric Reliability Corporation and standards set by the | ||
National Institute of Standards and Technology to determine the | ||
most appropriate standards for protecting grid infrastructure in | ||
this state. | ||
(f) The security commission shall investigate the steps | ||
that local communities and other states have taken to address grid | ||
resilience. The security commission may request funding to conduct | ||
site visits to these locations as required. | ||
(g) The security commission shall identify universities | ||
based in this state that have expertise in cybersecurity and other | ||
matters that can contribute to the security commission's goal of | ||
mitigating all hazards to the grid in this state. | ||
(h) In carrying out the security commission's duties under | ||
this section, the security commission may solicit information from: | ||
(1) defense contractors with experience protecting | ||
defense systems from electromagnetic pulse; | ||
(2) electric utilities that have developed | ||
electromagnetic pulse protections for the utilities' grid assets; | ||
(3) the United States Department of Homeland Security; | ||
and | ||
(4) the Commission to Assess the Threat to the United | ||
States from Electromagnetic Pulse (EMP) Attack. | ||
Sec. 44.006. RESILIENCE STANDARDS. (a) Based on the | ||
findings of the evaluations and investigations conducted under | ||
Section 44.005, the security commission shall develop and adopt | ||
resilience standards for municipalities and critical components of | ||
the ERCOT electric grid. | ||
(b) Standards developed and adopted for energy systems of | ||
municipalities must include provisions to ensure that energy, | ||
electric power, and fuel supplies are protected and available for | ||
recovery in the event of a catastrophic power outage. | ||
Sec. 44.007. CONTRACTOR SUPPORT FOR CRITICAL SYSTEM AND | ||
COMPONENT RESILIENCE. (a) The State Office of Risk Management, | ||
with assistance from the security commission, shall select | ||
contractors with proven expertise to identify critical systems and | ||
components of the ERCOT electric grid vulnerable to hazards | ||
described by Section 44.005(a) with a specific emphasis on the most | ||
dangerous cyber and electromagnetic threats. | ||
(b) A contractor selected under Subsection (a) must | ||
identify the critical components, including industrial control | ||
systems, not later than six months after the date the contractor is | ||
engaged. | ||
(c) Not later than January 1, 2025, an entity that owns or | ||
operates a component identified by a contractor under Subsection | ||
(a) as critical shall upgrade the component as necessary for the | ||
component to meet the applicable standards set by the security | ||
commission under Section 44.006. | ||
(d) The State Office of Risk Management shall select | ||
contractors with demonstrated expertise to verify whether an entity | ||
with a component identified as critical under Subsection (a) has | ||
upgraded components as required by Subsection (c). | ||
Sec. 44.008. PLAN FOR ALL HAZARDS RESILIENCE. (a) Not | ||
later than January 1, 2024, the security commission shall prepare | ||
and deliver to the legislature a plan for protecting the ERCOT | ||
electric grid from all hazards, including a catastrophic loss of | ||
power in the state. | ||
(b) The plan must include: | ||
(1) weatherizing requirements to prevent blackouts | ||
from extreme cold weather events, an analysis of whether these | ||
requirements would induce cyber vulnerabilities, and an analysis of | ||
the associated costs for these requirements; | ||
(2) provisions for installing, replacing, or | ||
upgrading industrial control systems and associated networks, or | ||
the use of compensating controls or procedures, in critical | ||
facilities to address cyber vulnerabilities; | ||
(3) provisions for installing, replacing, or | ||
upgrading extra high-voltage power transformers and supervisory | ||
control and data acquisition systems to withstand 100 | ||
kilovolts/meter E1 electromagnetic pulses and 85 volts/kilometer | ||
E3 electromagnetic pulses; | ||
(4) a timeline for making improvements to remaining | ||
infrastructure to meet resilience standards adopted by the security | ||
commission under Section 44.006; | ||
(5) long-term resilience provisions for supporting | ||
industries including: | ||
(A) nuclear reactors, materials, and waste; | ||
(B) fuel supply; | ||
(C) health care; | ||
(D) communications; | ||
(E) water and sewer services; | ||
(F) food supply; and | ||
(G) transportation; and | ||
(6) any additional provisions considered necessary by | ||
the security commission. | ||
(c) The security commission may consult with the Private | ||
Sector Advisory Council in developing the plan. | ||
(d) The Texas Division of Emergency Management shall | ||
incorporate the plan into the state emergency management plan and | ||
update the state emergency management plan as necessary to | ||
incorporate progressive resilience improvements. | ||
Sec. 44.009. GRID RESILIENCE REPORT. (a) Not later than | ||
January 1 of each year, the security commission shall prepare and | ||
deliver a nonclassified report to the legislature, the governor, | ||
and the commission assessing natural and man-made threats to the | ||
electric grid and efforts to mitigate the threats. | ||
(b) The security commission shall make the report available | ||
to the public. | ||
(c) In preparing the report, the security commission may | ||
hold confidential or classified briefings with federal, state, and | ||
local officials as necessary. | ||
Sec. 44.010. RESILIENCE COST RECOVERY. A regulatory | ||
authority shall include in establishing the rates of an electric | ||
utility consideration of the costs incurred to install, replace, or | ||
upgrade facilities or equipment to meet a resilience standard | ||
established under this chapter. A regulatory authority shall | ||
presume that costs incurred to meet a resilience standard under | ||
this chapter are reasonable and necessary expenses. | ||
Sec. 44.011. MICRO-GRIDS. (a) The security commission | ||
shall establish resilience standards for micro-grids and certify a | ||
micro-grid that meets the standards. The standards must be | ||
developed for both alternating current and direct current | ||
micro-grids. | ||
(b) Except as provided by Subsection (c), a municipality or | ||
other political subdivision may not enact or enforce an ordinance | ||
or other measure that bans, limits, or otherwise regulates inside | ||
the boundaries or extraterritorial jurisdiction of the | ||
municipality or political subdivision a micro-grid that is | ||
certified by the security commission under this section. | ||
(c) The owner or operator of a micro-grid certified by the | ||
security commission is a power generation company and is required | ||
to register under Section 39.351(a). The owner or operator of the | ||
micro-grid is entitled to: | ||
(1) interconnect the micro-grid; | ||
(2) obtain transmission service for the micro-grid; | ||
and | ||
(3) use the micro-grid to sell electricity and | ||
ancillary services at wholesale in a manner consistent with the | ||
provisions of this title and commission rules applicable to a power | ||
generation company or an exempt wholesale generator. | ||
Sec. 44.012. COMPLIANCE AND ENFORCEMENT. (a) The | ||
commission by rule shall require entities that the commission | ||
determines operate critical components of the ERCOT electric grid | ||
to comply with resilience standards adopted by the security | ||
commission under this chapter. This subsection applies only to an | ||
entity that is subject to the jurisdiction of the commission under | ||
another provision of this subtitle. The commission may impose an | ||
administrative penalty, in the manner provided by Chapter 15, on an | ||
entity that is subject to the jurisdiction of the commission under | ||
another provision of this subtitle for a violation of a resilience | ||
standard or of Subsection (b). | ||
(b) The commission by rule shall require each entity | ||
described by Subsection (a) to make publicly available on an | ||
Internet website the entity's compliance status with the resilience | ||
standards. | ||
(c) The Railroad Commission of Texas by rule shall require | ||
entities that the Railroad Commission of Texas determines operate | ||
critical components of the ERCOT electric grid to comply with | ||
resilience standards adopted by the security commission under this | ||
chapter. This subsection applies only to an entity that is subject | ||
to the jurisdiction of the Railroad Commission of Texas under | ||
Section 81.051, Natural Resources Code. The Railroad Commission of | ||
Texas may impose an administrative penalty, in the manner provided | ||
by Chapter 81, Natural Resources Code, on an entity that is subject | ||
to the jurisdiction of the Railroad Commission of Texas under | ||
Section 81.051, Natural Resources Code, for a violation of a | ||
resilience standard or of Subsection (d). | ||
(d) The Railroad Commission of Texas by rule shall require | ||
each entity described by Subsection (c) to make publicly available | ||
on an Internet website the entity's compliance status with the | ||
resilience standards. | ||
SECTION 3. Not later than January 1, 2025, the Texas Grid | ||
Security Commission shall prepare and deliver a report to the | ||
legislature on the progress of implementing resilience standards | ||
adopted and implemented under Sections 44.006 and 44.007, Utilities | ||
Code, as added by this Act. | ||
SECTION 4. This Act takes effect immediately if it receives | ||
a vote of two-thirds of all the members elected to each house, as | ||
provided by Section 39, Article III, Texas Constitution. If this | ||
Act does not receive the vote necessary for immediate effect, this | ||
Act takes effect September 1, 2023. |