Bill Text: TX SB573 | 2011-2012 | 82nd Legislature | Engrossed
NOTE: There are more recent revisions of this legislation. Read Latest Draft
Bill Title: Relating to certificates of public convenience and necessity for water or sewer services.
Spectrum: Slight Partisan Bill (Republican 6-2)
Status: (Passed) 2011-06-17 - Effective on 9/1/11 [SB573 Detail]
Download: Texas-2011-SB573-Engrossed.html
Bill Title: Relating to certificates of public convenience and necessity for water or sewer services.
Spectrum: Slight Partisan Bill (Republican 6-2)
Status: (Passed) 2011-06-17 - Effective on 9/1/11 [SB573 Detail]
Download: Texas-2011-SB573-Engrossed.html
By: Nichols, et al. | S.B. No. 573 |
|
||
|
||
relating to certificates of public convenience and necessity for | ||
water or sewer services. | ||
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | ||
SECTION 1. Section 13.254, Water Code, is amended by | ||
amending Subsections (a) and (a-2) and adding Subsections (a-5) and | ||
(a-6) to read as follows: | ||
(a) The commission at any time after notice and hearing | ||
may[ |
||
|
||
convenience and necessity with the written consent of the | ||
certificate holder or if it finds that: | ||
(1) the certificate holder has never provided, is no | ||
longer providing, is incapable of providing, or has failed to | ||
provide continuous and adequate service in the area, or part of the | ||
area, covered by the certificate; | ||
(2) in an affected county as defined in Section | ||
16.341, the cost of providing service by the certificate holder is | ||
so prohibitively expensive as to constitute denial of service, | ||
provided that, for commercial developments or for residential | ||
developments started after September 1, 1997, in an affected county | ||
as defined in Section 16.341, the fact that the cost of obtaining | ||
service from the currently certificated retail public utility makes | ||
the development economically unfeasible does not render such cost | ||
prohibitively expensive in the absence of other relevant factors; | ||
(3) the certificate holder has agreed in writing to | ||
allow another retail public utility to provide service within its | ||
service area, except for an interim period, without amending its | ||
certificate; or | ||
(4) the certificate holder has failed to file a cease | ||
and desist action pursuant to Section 13.252 within 180 days of the | ||
date that it became aware that another retail public utility was | ||
providing service within its service area, unless the certificate | ||
holder demonstrates good cause for its failure to file such action | ||
within the 180 days. | ||
(a-2) A landowner is not entitled to make the election | ||
described in Subsection (a-1) or (a-5) but is entitled to contest | ||
under Subsection (a) the involuntary certification of its property | ||
in a hearing held by the commission if the landowner's property is | ||
located: | ||
(1) within the boundaries of any municipality or the | ||
extraterritorial jurisdiction of a municipality with a population | ||
of more than 500,000 and the municipality or retail public utility | ||
owned by the municipality is the holder of the certificate; or | ||
(2) in a platted subdivision actually receiving water | ||
or sewer service. | ||
(a-5) As an alternative to decertification under Subsection | ||
(a) and expedited release under Subsection (a-1), the owner of a | ||
tract of land that is at least 25 acres and that is not receiving | ||
water or sewer service may petition for expedited release of the | ||
area from a certificate of public convenience and necessity and is | ||
entitled to that release if the landowner's property is located in a | ||
county with a population of at least one million, a county adjacent | ||
to a county with a population of at least one million, or a county | ||
with a population of more than 200,000 and less than 220,000. | ||
(a-6) The commission shall grant a petition received under | ||
Subsection (a-5) not later than the 60th day after the date the | ||
landowner files the petition. The commission may not deny a | ||
petition received under Subsection (a-5) based on the fact that a | ||
certificate holder is a borrower under a federal loan program. The | ||
commission may require an award of compensation to a decertified | ||
retail public utility that is the subject of a petition filed under | ||
Subsection (a-5) as otherwise provided by this section. | ||
SECTION 2. This Act takes effect September 1, 2011. |