US HB5551 | 2023-2024 | 118th Congress
Status
Spectrum: Partisan Bill (Democrat 1-0)
Status: Introduced on September 18 2023 - 25% progression, died in committee
Action: 2023-09-22 - Referred to the Subcommittee on Energy, Climate and Grid Security.
Pending: House Subcommittee on Energy, Climate and Grid Security Committee
Text: Latest bill text (Introduced) [PDF]
Status: Introduced on September 18 2023 - 25% progression, died in committee
Action: 2023-09-22 - Referred to the Subcommittee on Energy, Climate and Grid Security.
Pending: House Subcommittee on Energy, Climate and Grid Security Committee
Text: Latest bill text (Introduced) [PDF]
Summary
To require the Federal Energy Regulatory Commission to establish minimum interregional transfer capabilities, and for other purposes.
Title
BIG WIRES Act Building Integrated Grids With Inter-Regional Energy Supply Act
Sponsors
Rep. Scott Peters [D-CA] |
History
Date | Chamber | Action |
---|---|---|
2023-09-22 | House | Referred to the Subcommittee on Energy, Climate and Grid Security. |
2023-09-18 | House | Referred to the House Committee on Energy and Commerce. |
2023-09-18 | House | Introduced in House |
Same As/Similar To
SB2827 (Same As) 2023-09-18 - Read twice and referred to the Committee on Energy and Natural Resources.
Subjects
US Congress State Sources
Type | Source |
---|---|
Summary | https://www.congress.gov/bill/118th-congress/house-bill/5551/all-info |
Text | https://www.congress.gov/118/bills/hr5551/BILLS-118hr5551ih.pdf |