US HB8085 | 2023-2024 | 118th Congress
Status
Spectrum: Partisan Bill (Democrat 1-0)
Status: Introduced on April 19 2024 - 25% progression
Action: 2024-04-26 - Referred to the Subcommittee on Energy, Climate and Grid Security.
Pending: House Subcommittee on Energy, Climate and Grid Security Committee
Text: Latest bill text (Introduced) [PDF]
Status: Introduced on April 19 2024 - 25% progression
Action: 2024-04-26 - Referred to the Subcommittee on Energy, Climate and Grid Security.
Pending: House Subcommittee on Energy, Climate and Grid Security Committee
Text: Latest bill text (Introduced) [PDF]
Summary
To require the Federal Energy Regulatory Commission to promulgate regulations that accelerate the interconnection of electric generation and storage resources to the transmission system through more efficient and effective interconnection procedures.
Title
Expediting Generator Interconnection Procedures Act of 2024
Sponsors
Rep. Kathy Castor [D-FL] |
History
Date | Chamber | Action |
---|---|---|
2024-04-26 | House | Referred to the Subcommittee on Energy, Climate and Grid Security. |
2024-04-19 | House | Referred to the House Committee on Energy and Commerce. |
2024-04-19 | House | Introduced in House |
Same As/Similar To
SB4190 (Same As) 2024-04-18 - Read twice and referred to the Committee on Energy and Natural Resources.
Subjects
US Congress State Sources
Type | Source |
---|---|
Summary | https://www.congress.gov/bill/118th-congress/house-bill/8085/all-info |
Text | https://www.congress.gov/118/bills/hr8085/BILLS-118hr8085ih.pdf |