US SB275 | 2013-2014 | 113th Congress
Status
Spectrum: Partisan Bill (Republican 2-0)
Status: Introduced on February 11 2013 - 25% progression, died in committee
Action: 2013-02-11 - Read twice and referred to the Committee on Energy and Natural Resources.
Pending: Senate Energy And Natural Resources Committee
Text: Latest bill text (Introduced) [PDF]
Status: Introduced on February 11 2013 - 25% progression, died in committee
Action: 2013-02-11 - Read twice and referred to the Committee on Energy and Natural Resources.
Pending: Senate Energy And Natural Resources Committee
Text: Latest bill text (Introduced) [PDF]
Summary
Directs the Federal Energy Regulatory Commission (FERC), upon the request of the licensee for the project numbered 12063 (Little Wood River Ranch, Idaho), to: (1) extend for three years after enactment of this Act the time period during which the licensee is required to commence the construction of project works; or (2) if the license for Project No. 12063 has been terminated, reinstate the license and extend for three years after enactment of this Act the time period during which the licensee is required to commence the construction of project works.
Title
A bill to reinstate and extend the deadline for commencement of construction of a hydroelectric project involving the Little Wood River Ranch.
Sponsors
Sen. James Risch [R-ID] | Sen. Mike Crapo [R-ID] |
History
Date | Chamber | Action |
---|---|---|
2013-02-11 | Senate | Read twice and referred to the Committee on Energy and Natural Resources. |
Same As/Similar To
SB276 (Related) 2014-09-26 - Became Public Law No: 113-177.
Subjects
Alternative and renewable resources
Electric power generation and transmission
Energy
Idaho
Licensing and registrations
Electric power generation and transmission
Energy
Idaho
Licensing and registrations
US Congress State Sources
Type | Source |
---|---|
Summary | https://www.congress.gov/bill/113th-congress/senate-bill/275/all-info |
Text | https://www.congress.gov/113/bills/s275/BILLS-113s275is.pdf |