VA HB2103 | 2019 | Regular Session
Status
Spectrum: Partisan Bill (Republican 1-0)
Status: Introduced on January 8 2019 - 25% progression, died in committee
Action: 2019-02-05 - Left in Agriculture, Chesapeake and Natural Resources
Pending: House Agriculture, Chesapeake and Natural Resources Committee
Text: Latest bill text (Prefiled) [HTML]
Status: Introduced on January 8 2019 - 25% progression, died in committee
Action: 2019-02-05 - Left in Agriculture, Chesapeake and Natural Resources
Pending: House Agriculture, Chesapeake and Natural Resources Committee
Text: Latest bill text (Prefiled) [HTML]
Summary
Stormwater management plans; erosion and sediment control plans; portion of project. Directs the State Water Control Board to establish a procedure that allows an operator to submit stormwater management plans that are sufficient for a particular proposed land-disturbing activity without requiring such plans to cover any subsequent land-disturbing activity anticipated at the same location or an adjacent location. The bill also amends a provision of the law that is not yet effective, directing the establishment of the same procedure as it applies not only to stormwater management plans but also to erosion and sediment control plans.
Title
Stormwater management plans; erosion and sediment control plans, portion of project.
Sponsors
Roll Calls
2019-01-30 - House - House: Subcommittee recommends laying on the table (8-Y 2-N) (Y: 8 N: 2 NV: 0 Abs: 0) [PASS]
History
Date | Chamber | Action |
---|---|---|
2019-02-05 | House | Left in Agriculture, Chesapeake and Natural Resources |
2019-01-30 | House | Subcommittee recommends laying on the table (8-Y 2-N) |
2019-01-16 | House | Assigned ACNR sub: Subcommittee #3 |
2019-01-08 | House | Referred to Committee on Agriculture, Chesapeake and Natural Resources |
2019-01-08 | House | Prefiled and ordered printed; offered 01/09/19 19104080D |