Bill Text: CA SB1088 | 2017-2018 | Regular Session | Amended
Bill Title: Safety, reliability, and resiliency planning: general rate case cycle.
Spectrum: Partisan Bill (Democrat 1-0)
Status: (Engrossed - Dead) 2018-07-05 - Re-referred to Com. on RLS. pursuant to Assembly Rule 96. [SB1088 Detail]
Download: California-2017-SB1088-Amended.html
Amended
IN
Senate
March 15, 2018 |
Senate Bill | No. 1088 |
Introduced by Senator Dodd |
February 12, 2018 |
LEGISLATIVE COUNSEL'S DIGEST
This bill would make legislative findings and declarations relative to the need for, and adoption of, safety and resilience plans by electrical and gas corporations, and the approval and enforcement of those plans by the commission, and would state the intent of the Legislature to enact later legislation to implement those findings and declarations.
Digest Key
Vote: MAJORITY Appropriation: NO Fiscal Committee:Bill Text
The people of the State of California do enact as follows:
SECTION 1.
The Legislature finds and declares as follows:SEC. 2.
Section 8587.13 is added to the Government Code, to read:8587.13.
(a) For purposes of this section, “major event” means a large storm, flood, mudslide, fire, earthquake, or other occurrence that significantly affects the safety and reliability of the electrical or gas distribution system.SEC. 3.
Chapter 11 (commencing with Section 2899) is added to Part 2 of Division 1 of the Public Utilities Code, to read:CHAPTER 11. Utility Infrastructure, Safety, Reliability, and Accountability
2899.
This chapter shall be known, and may be cited, as the Utility Infrastructure, Safety, Reliability, and Accountability Act.2899.1.
For purposes of this chapter, the following definitions apply:2899.2.
(a) On or before January 15, 2019, and on or before January 15 every two years thereafter, each utility shall prepare and submit to the commission for review and approval a safety, reliability, and resiliency plan. The plan submitted on or before January 15, 2019, shall be limited to addressing fire risks, with subsequent plans addressing risks associated with routine operation and all major events.2899.3.
(a) For purposes of this section, “distribution safety or reliability obligations” of an electrical corporation include, but are not limited to, owning, controlling, operating, managing, maintaining, planning, engineering, designing, investing in, and constructing the distribution system in its service territory, system reliability, emergency response and restoration, vegetation management, service connections, service turnons and turnoffs, and service inquiries relating to the operation of the distribution system.2899.4.
The commission shall conduct an annual proceeding to review each utility’s compliance with its plan, including a factual analysis of any major events that occurred, as follows:2899.5.
The commission shall assess penalties if a utility fails to substantially comply with its plan. In determining an appropriate amount of the penalty, the commission shall consider all of the following:2899.6.
After completing the review pursuant to Section 2899.4, if the commission determines that a utility was in substantial compliance with its plan, the utility’s performance, operations, management, and investments addressed in the plan shall be deemed reasonable and prudent for all purposes.(a)The Legislature finds and declares all of the following:
(1)The effects of climate change are happening now and will continue to increase both around the world and in California.
(2)There will be more frequent and increasingly severe storms, floods, mudslides, and wildfires.
(3)Emissions of greenhouse gases from wildfires undermine California’s goals to reduce those emissions. The amount of emissions of greenhouse gases from the 2017 wildfires was estimated to be nearly as much as the total amount of 2017 emissions from electrical
generation.
(4)The electrical and gas transmission and distribution systems can be the cause of fires which, because of climate change, can be much more severe.
(5)The electrical and natural gas transmission and distribution systems can be impacted by storms, floods, mudslides, wildfires, earthquakes, and other major events. These impacts can, and have, caused loss of life, tremendous property damage, and damage to local economies.
(6)California is overdue for a major earthquake.
(7)Natural disasters can cause vast economic damage. The North Bay suffered major economic impacts to businesses and many jobs were lost as a result of the 2017 wildfires.
(8)Failure to prepare for the effects of climate change would adversely affect the credit rating of California and local jurisdictions.
(9)Preventing or mitigating damage from storms, floods, mudslides, wildfires, earthquakes, and other major events is much safer for life and property, better for local economies, and far less expensive than emergency repair and reconstruction.
(10)Responding to storms, floods, mudslides, wildfires, earthquakes, and other major events requires a substantial, well-trained local utility workforce. After the 2017 North Bay wildfires, Pacific Gas and Electric Company utilized 4,300 employees to quickly repair and restore utility service to its customers. The commission should require
that each electrical and gas corporation have a sufficiently sized and trained workforce to respond quickly to major events.
(11)The commission has failed to establish adequate standards to reduce the risk of wildfires caused by utility equipment and to make electrical and gas corporations’ equipment more resilient and resistant to damage.
(12)The commission should establish wildfire risk reduction and mitigation standards including standards for disabling reclosers and deenergizing electrical lines. All standards should meet or exceed industry best practices. Disabling reclosers and deenergizing electrical lines can cause impacts to fire and police response, the availability of water, hospitals, schools, evacuation centers, and other critical facilities. The commission should
require electrical corporations to construct, operate, and maintain microgrids so that critical facilities do not lose electrical service in the event of major events. The commission shall not rely on unregulated entities in lieu of public utilities to provide electrical safety or reliability.
(13)Every other year, the commission should require each electrical corporation and each gas corporation to prepare and submit its utility safety and resilience plan for review and approval. Each plan should include all relevant standards and practices to prevent and mitigate risk from storms, floods, mudslides, wildfires, earthquakes, and other major events, and measures to comply with those standards and practices including investment and operation plans, utility microgrids, and workforce sizing and training practices. These safety and resilience
plans should incorporate the disaster and emergency preparedness standards and plans prepared pursuant to Section 768.6. The plans should include a budget for all capital costs, and operations and maintenance expenses, including insurance levels and costs, needed to implement the plan. The commission should review the plans in a single proceeding for all energy utilities and either approve or approve with modifications each plan, including authorizing the revenue
requirements to implement the plans. Any revenue requirement authorized in this proceeding should not also be eligible for recovery in any other proceeding. After the proceeding in which the plans are initially reviewed and approved, each subsequent proceeding under this paragraph should review each energy utility’s compliance with its approved plan along with a review of costs of any repair and restoration for catastrophic events.
(14)Failure of an energy utility to substantially comply with an approved plan should result in shareholders of the utility paying penalties. Penalties should be tiered based on the severity of the noncompliance and should credit self-reporting of violations. Substantial compliance with an approved plan should mean that the utility acted reasonably and prudently.
(15)Safety and reliability should be the first priority in all commission decisions.
(16)The Office of the Safety Advocate should participate in all proceedings authorized by this section.
(b)It is the intent of the Legislature to enact later Legislation to implement the findings and declarations of subdivision (a).