Bill Text: HI SB2354 | 2010 | Regular Session | Introduced


Bill Title: CIP; 19th Senatorial District

Spectrum: Partisan Bill (Democrat 1-0)

Status: (Introduced - Dead) 2010-01-22 - (S) Referred to WAM. [SB2354 Detail]

Download: Hawaii-2010-SB2354-Introduced.html

THE SENATE

S.B. NO.

2354

TWENTY-FIFTH LEGISLATURE, 2010

 

STATE OF HAWAII

 

 

 

 

 

 

A BILL FOR AN ACT

 

 

RELATING TO CAPITAL IMPROVEMENT PROJECTS FOR THE BENEFIT OF THE Nineteenth SENATORIAL DISTRICT.

 

 

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:

 


     SECTION 1.  The director of finance is authorized to issue general obligation bonds in the sum of $142,490,000 or so much thereof as may be necessary and the same sum or so much thereof as may be necessary is appropriated for fiscal year 2010-2011 for capital improvement projects for the nineteenth senatorial district, as follows:

1.   Barbers point elementary school

     A.   Air conditioning for entire school.

          Design                                    $  350,000

          Construction                              3,150,000

              Total Funding                         $     3,500,000

2.   Kaleiopuu elementary school

     A.   Air conditioning for entire school.

          Design                                    $  350,000

          Construction                               3,150,000

              Total Funding                         $     3,500,000

     B.   Electrical upgrades.

          Design                                    $   55,000

          Construction                                 495,000

               Total Funding                         $  550,000

3.   Kapolei middle school

     A.   Restrooms for portables.

          Design                                    $   60,000

          Construction                                 540,000

              Total Funding                         $  600,000

     B.   Shelter in place (library, buildings A, C, E, F, G, H, I).

          Design                                    $   86,000

          Construction                                 774,000

              Total Funding                         $  860,000

     C.   Bus loading area and circulation improvements.

          Design                                    $  260,000

          Construction                               2,340,000

              Total Funding                         $     2,600,000

     D.   Additional parking.

          Design                                    $  100,000

          Construction                                 900,000

              Total Funding                         $     1,000,000

     E.   Connection to board of water supply recycled water system.

          Design                                    $   40,000

          Construction                                 360,000

              Total Funding                         $  400,000

4.   Kapolei high school

     A.   Athletic complex improvements, including locker rooms, two classrooms, and two portable classrooms.

          Construction                              $     5,000,000

              Total Funding                         $     5,000,000

     B.   SPED trailer (3).

          Design                                    $  100,000

          Construction                                 900,000

              Total Funding                         $     1,000,000

     C.   Restrooms for portables.

          Design                                    $   60,000

          Construction                                 540,000

              Total Funding                         $  600,000

     D.   Shelter in place (administration, buildings B, D, G, H).

          Design                                    $   70,000

          Construction                                 630,000

              Total Funding                         $  700,000

5.   Mauka Lani elementary school

     A.   Air conditioning for entire school.

          Design                                    $  350,000

          Construction                               3,150,000

              Total Funding                         $     3,500,000

     B.   Classroom building.

          Design                                    $  390,000

          Construction                               3,510,000

              Total Funding                         $     3,900,000

     C.   Electrical upgrades.

          Design                                    $   47,000

          Construction                                 423,000

              Total Funding                         $  470,000

6.   Makakilo elementary school

     A.   Air conditioning in entire school.

          Design                                    $  350,000

          Construction                               3,150,000

              Total Funding                         $     3,500,000

     B.   SPED portable classroom.

          Design                                    $   40,000

          Construction                                 360,000

              Total Funding                         $  400,000

     C.   ADA transition accessibility.

          Design                                    $   40,000

          Construction                                 360,000

              Total Funding                         $  400,000

7.   Kapolei II elementary school, new school.

          Construction                                   $42,320,000

              Total Funding     $42,320,000

8.   Royal Kunia elementary, new school

          Design                                             $ 3,840,000

              Total Funding                         $ 3,840,000

9.   Kamehameha highway/Lumiaina street intersection improvements

          Design                                    $   50,000

          Construction                              $  300,000

              Total Funding                         $  350,000

10.    Farrington highway improvements between Honokai Hale and Hakimo road, Oahu

          Construction                              $     12,500,000

              Total Funding     $12,500,000

11.    Interstate Route H-1, Paiwa IC to Makakilo IC, and Interstate Route H-2, Waiawa IC to Mililani IC, Highway Lighting Improvements

          Construction                              $     3,000,000

              Total Funding                         $     3,000,000

12.    University of Hawaii, West Oahu, site work and water tank

          Construction                              $     48,000,000

              Total Funding     $48,000,000

     SECTION 2.  The appropriations made for the capital improvement projects authorized by this Act shall not lapse at the end of the fiscal biennium for which the appropriations are made; provided that all moneys from the appropriation unencumbered as of June 30, 2012, shall lapse as of that date.

     SECTION 3.  The sums appropriated for the respective capital projects set forth in section 1 shall be expended by the designated expending agency for the purposes of this Act; provided that:

     (1)  The sums appropriated in items 1 through 8 shall be expended by the department of education;

     (2)  The sums appropriated in items 9 through 11 shall be expended by the department of transportation; and

     (3)  The sum appropriated in item 12 shall be expended by the University of Hawaii.

     SECTION 4.  This Act shall take effect on July 1, 2010.

 

INTRODUCED BY:

_____________________________

 

 


 


 

Report Title:

CIP; 19th Senatorial District

 

Description:

Authorizes issuance of GO bonds and appropriates funds for capital improvement projects to benefit the 19th senatorial district.

 

 

 

The summary description of legislation appearing on this page is for informational purposes only and is not legislation or evidence of legislative intent.