Bill Texts: LA SB126 | 2012 | Regular Session

Bill Title: Extends the length of time relative to the utilization of design-build contracts and authorizes the Orleans Parish School Board to use design-build contracts. (7/1/12) (EN SEE FISC NOTE See Note)

Spectrum: Partisan Bill (Democrat 1-0)

Status: (Passed) 2012-05-31 - Effective date 7/1/12. [SB126 Detail]

Bill Drafts

RevisionDateFormatSourceView
ChapteredNot AvailPDFLinkView
EnrolledNot AvailPDFLinkView
EngrossedNot AvailPDFLinkView
IntroducedNot AvailPDFLinkView

Amendments

AmendmentDateDispositionFormatSourceView
No bill amendments currently on file for Louisiana SB126

Supplemental Documents

TitleDescriptionDateFormatSourceView
No supplemental documents for Louisiana SB126 currently on file.

Social Comments on LA SB126

feedback