Bill Text: LA SB126 | 2012 | Regular Session | Chaptered
Bill Title: Extends the length of time relative to the utilization of design-build contracts and authorizes the Orleans Parish School Board to use design-build contracts. (7/1/12) (EN SEE FISC NOTE See Note)
Spectrum: Partisan Bill (Democrat 1-0)
Status: (Passed) 2012-05-31 - Effective date 7/1/12. [SB126 Detail]
Download: Louisiana-2012-SB126-Chaptered.pdf