NJ A2887 | 2012-2013 | Regular Session
Status
Spectrum: Strong Partisan Bill (Democrat 14-1)
Status: Vetoed on January 13 2014 - 100% progression
Action: 2014-01-13 - Absolute Veto, Received in the Assembly
Text: Latest bill text (Introduced) [HTML]
Status: Vetoed on January 13 2014 - 100% progression
Action: 2014-01-13 - Absolute Veto, Received in the Assembly
Text: Latest bill text (Introduced) [HTML]
Summary
Requires Energy Master Plan to include long-term capacity planning and infrastructure planning.
Title
Requires Energy Master Plan to include long-term capacity planning and infrastructure planning.
Sponsors
Roll Calls
2013-12-19 - Senate - Senate Third Reading - Final Passage (Y: 36 N: 0 NV: 4 Abs: 0) [PASS]
2013-12-19 - Senate - Senate Substitute For S2758 (Voice Vote) (Y: 0 N: 0 NV: 0 Abs: 0) [PASS]
2013-03-21 - Assembly - Assembly Third Reading - Final Passage (Y: 71 N: 0 NV: 9 Abs: 0) [PASS]
2013-12-19 - Senate - Senate Substitute For S2758 (Voice Vote) (Y: 0 N: 0 NV: 0 Abs: 0) [PASS]
2013-03-21 - Assembly - Assembly Third Reading - Final Passage (Y: 71 N: 0 NV: 9 Abs: 0) [PASS]
History
Date | Chamber | Action |
---|---|---|
2014-01-13 | Assembly | Absolute Veto, Received in the Assembly |
2013-12-19 | Senate | Passed Senate (Passed Both Houses) (36-0) |
2013-12-19 | Senate | Substituted for S2758 |
2013-12-05 | Senate | Reported from Senate Committee, 2nd Reading |
2013-11-14 | Senate | Transferred to Senate Environment and Energy Committee |
2013-04-15 | Senate | Received in the Senate, Referred to Senate Economic Growth Committee |
2013-03-21 | Assembly | Passed by the Assembly (71-0-6) |
2013-01-28 | Assembly | Assembly Floor Amendment Passed (Chivukula) |
2012-12-13 | Assembly | Reported out of Assembly Committee, 2nd Reading |
2012-05-14 | Assembly | Introduced, Referred to Assembly Telecommunications and Utilities Committee |
Same As/Similar To
S2758 (Same As) 2013-12-19 - Substituted by A2887 (1R)