NJ S245 | 2024-2025 | Regular Session
Note: Carry Over of previous S3489
Note: Carry Over of previous A5128
Note: Carry Over of previous A5128
Status
Spectrum: Partisan Bill (Democrat 3-0)
Status: Introduced on January 9 2024 - 25% progression
Action: 2024-01-09 - Introduced in the Senate, Referred to Senate Environment and Energy Committee
Pending: Senate Environment and Energy Committee
Text: Latest bill text (Introduced) [HTML]
Status: Introduced on January 9 2024 - 25% progression
Action: 2024-01-09 - Introduced in the Senate, Referred to Senate Environment and Energy Committee
Pending: Senate Environment and Energy Committee
Text: Latest bill text (Introduced) [HTML]
Summary
Requires BPU to study and implement methods to allow additional distributed energy sources to interconnect to electrical grid.
Title
Requires BPU to study and implement methods to allow additional distributed energy sources to interconnect to electrical grid.
Sponsors
History
Date | Chamber | Action |
---|---|---|
2024-01-09 | Senate | Introduced in the Senate, Referred to Senate Environment and Energy Committee |
Same As/Similar To
S3489 (Carry Over) 2023-02-06 - Received in the Assembly, Referred to Assembly Telecommunications and Utilities Committee
A5128 (Carry Over) 2023-02-06 - Introduced, Referred to Assembly Special Committee on Infrastructure and Natural Resources Committee
A585 (Same As) 2024-01-09 - Introduced, Referred to Assembly Telecommunications and Utilities Committee
A5128 (Carry Over) 2023-02-06 - Introduced, Referred to Assembly Special Committee on Infrastructure and Natural Resources Committee
A585 (Same As) 2024-01-09 - Introduced, Referred to Assembly Telecommunications and Utilities Committee
Subjects
New Jersey State Sources
Type | Source |
---|---|
Summary | https://www.njleg.state.nj.us/bill-search/2024/S245 |
Text | https://pub.njleg.gov/Bills/2024/S0500/245_I1.HTM |