Votes: NJ S245 | 2024-2025 | Regular Session
Bill Title: Requires BPU to study and implement methods to allow additional distributed energy sources to interconnect to electrical grid.
Spectrum: Partisan Bill (Democrat 3-0)
Status: (Introduced) 2024-01-09 - Introduced in the Senate, Referred to Senate Environment and Energy Committee [S245 Detail]
Text: Latest bill text (Introduced) [HTML]
States not producing parsable votes may be available as images in Supplemental Documents.
Spectrum: Partisan Bill (Democrat 3-0)
Status: (Introduced) 2024-01-09 - Introduced in the Senate, Referred to Senate Environment and Energy Committee [S245 Detail]
Text: Latest bill text (Introduced) [HTML]
Voting Records
Chamber | Vote | Date | Yea | Nay | NV | Abs | Total | Result | Source | View |
---|---|---|---|---|---|---|---|---|---|---|
No roll call record information currently on file. |