NY A05016 | 2013-2014 | General Assembly
Status
Spectrum: Partisan Bill (Republican 3-0)
Status: Introduced on February 14 2013 - 25% progression, died in committee
Action: 2014-05-20 - held for consideration in corporations, authorities and commissions
Pending: Assembly Corporations, Authorities and Commissions Committee
Text: Latest bill text (Introduced) [HTML]
Status: Introduced on February 14 2013 - 25% progression, died in committee
Action: 2014-05-20 - held for consideration in corporations, authorities and commissions
Pending: Assembly Corporations, Authorities and Commissions Committee
Text: Latest bill text (Introduced) [HTML]
Summary
Requires the power authority to conduct an analysis of the economic viability of certain electric generating facilities.
Title
Requires the power authority to conduct an analysis of the economic viability of certain electric generating facilities.
Sponsors
History
Date | Chamber | Action |
---|---|---|
2014-05-20 | Assembly | held for consideration in corporations, authorities and commissions |
2014-01-08 | Assembly | referred to corporations, authorities and commissions |
2013-02-14 | Assembly | referred to corporations, authorities and commissions |
Same As/Similar To
S02613 (Same As) 2014-01-08 - REFERRED TO CORPORATIONS, AUTHORITIES AND COMMISSIONS